sora-inspect/m350-infra

PúblicaAeronavegávelExemplo
Acompanhar205Derivar1Estrela1,3 mil
3 configurações 264 voos
Lista de peças
EstruturaMatrice 350 RTK3,77 kg
Carga útilZenmuse H30T920 g
Carga útilUpward gimbal extension340 g
AlimentaçãoTB65 ×21,35 kg
Controle de vooD-RTK 3 base station · ground side—
ComunicaçãoDJI Cellular120 g

Ficha da aeronave

M350 Infra

Our setup for bridge and power line inspections. The same configuration runs at 40 sites across Japan, and all maintenance records are collected here.

Configurations

  • bridge-underside shoots the underside of girders with an upward gimbal
  • powerline uses a modified compass calibration procedure for strong electromagnetic fields

Maintenance rules

  1. Replace propellers every 50 flights
  2. Retire batteries at 200 cycles
  3. Always open a maintenance issue for any anomaly